Flood Embankment Dam
Flood Embankment Dam
Flood Embankment Dam
Flood Embankment Dam
Flood Embankment Dam
Flood Embankment Dam

Flood Embankment Dam

Flood Barrier: News Products Case FAQS Solution Flood control embankment is a temporary small embankment that is repaired at the top of the adjacent water surface to prevent flood from overflowing t...

Enterprise one-stop service.

  • Place of Origin:Jiangsu, China
  • Payment Term:T/T, L/C, D/P
  • Delivery Time:Within 10 days
  • Packaging:Standard export packing
  • Min Order: 1
  • Stock: Yes

 

Leave Message PDF Download

Flood Embankment Dam

Flood control embankment is a temporary small embankment that is repaired at the top of the adjacent water surface to prevent flood from overflowing the top of the embankment. It is a kind of on-site assembly type embankment. It is usually used as a national, watershed or provincial and municipal fixed-point warehouse emergency equipment reserve, and is also directly equipped in the mobile emergency teams of provinces and cities.

Flood Embankment Dam

Flood Embankment Dam Attributes

Sub-embankment Size 1.3 m * 10 m
Designed River Width/Wave Height 4 km/0.3 m
Gross Weight of the Product 298 KG
Safety Factor 2.0 – 3.35 k
Height of the Sub-embankment 1.30/1.35 m
Construction Speed 60 minutes for 100 people/km
Width of the Sub-embankment Unit 1.0 m
Water Blocking Height 1.0 m
Design Wind Speed 6.0 m/s
Net Weight of the Product 255 kg
Applicable Embankment Quality Sandy loam, loam, clay, concrete, asphalt
Original Embankment Top Width More than 4.0 m
Structural composition It is mainly composed of corner frame, beam, fender, rubber elastomer and positioning fixed pile
Materials and technology The prefabricated slab dam breaks through the traditional thinking mode and abandons the traditional construction materials and techniques. It is a new, fast, cheap and environmentally friendly disaster prevention and mitigation equipment
Practical application Mainly used for sandy loam, loam, clay and concrete and other soft and hard levees for emergency flood prevention and rescue
Characteristic The prefabricated slab dam has the advantages of controlling water according to water, high efficiency and fast speed. DAMS are flexible and adaptable; Easy to store and transport, low cost; Recycling, green environmental protection and other features

1. Introduction of prefabricated slab dam flood control sublevee
When the water level rises and is likely to overflow the embankment, the prefabricated slab dam can be quickly bonded on the top of the embankment into a flood control embankment. Sublevees are assembled by several units; Each unit consists of two parts: a folding fender and a folding support Angle bracket. After each group of units is assembled, they are connected to each other by rib and fastener assembly to form a complete sublevee. The bottom of the panel is equipped with a positioning fix, which can fix the embankment on the top of the embankment.
2. Use of prefabricated plate dam for flood control sublevee
It is mainly used for sandy loam, loam, clay, concrete, asphalt and other soft levees for emergency flood prevention. To prevent the flood of embankments and DAMS, and to prevent the flood caused by low or excessive flood of embankments, river water level surges and exceeds the top of the embankments; Prevent the high water level in the flood season, due to the strong wind and waves caused by the river over the top of the embankment caused by local waves.
3, the main characteristics of prefabricated plate dam flood control sublevee
The prefabricated slab dam is a new, fast, cheap and environmentally friendly disaster prevention and mitigation equipment, abandoning the traditional construction materials and techniques.
With water control, fast; DAMS are flexible and adaptable; Easy to store and transport, low cost; Recycling, green environmental protection and other features.
Flood Embankment Dam Details DisplayFlood Embankment Dam Details DisplayFlood Embankment Dam Installation DetailsStructural principle
1, the structure and function of the prefabricated plate dam flood control embankment is mainly composed of six parts:
(1) corner frame: by the aluminum alloy profile axial connection, as the support frame of the dam body.
(2) Beam: made of aluminum alloy square material and special joint connection, as the dam body connection support rod.
(3) Fender: The corrugated glass steel material is connected with the beam through a special fixed device. Its functions are as follows: first, as a connecting piece, the adjacent Angle frame is connected to form the bearing carrier of the dam body; The second is as a rigid connection plate.
(4) Rubber elastomer: made of high-quality rubber with elastic function, used for sealing water between adjacent support plates.
(5) Positioning fixed piles: It is made of round steel. 2, the working principle of prefabricated plate dam flood control subdyke is based on the principle of hydraulic panel dam, with a number of Angle frames, beams and fenders connected to form a rigid subdyke dam body, and the fenders play the role of panel dam water retaining. During construction, it is buried in the embankment foundation soil to prevent seepage around.
Flood Embankment Dam Accessories Display
Apply
On-site rescue work of prefabricated slab dam flood control sublevee. With the characteristics of tight time, bad environment, strong technology and high safety, its organization and implementation must emphasize unified organization, unified plan, unified command and unified implementation; We must adhere to the pre-plan, scientific decision-making, full preparation, strong guarantee; It is necessary to ensure that the construction is carried out according to the technological process, the inspection is carried out according to the technical requirements, the acceptance is carried out according to the safety standards, and the maintenance work after the construction is continued.
Flood Embankment Dam Practical ApplicationFlood Embankment Dam Practical Application

Tags: Previous: Next:
Expand More
Leave Message
*
*
*